Monday, September 26, 2011

Old shed project

It is going slowly


The first part was getting the roof off.


After the roof I got the siding off and removed the rotted wood replacing as needed.


Most of the wood frame was in good shape.



I had to sink some 4 x 4's for the door support. I also bought the T-111 siding and 1 x 6's for the roof last week but could not work on it this weekend due to rain. I did get one side cut and painted but have the siding storing dry in the new shed until I can get back at it when the weather clears and the wood dries out (the garbage bags are full of crushed aluminum cans that I will cash in soon).


No comments:

Post a Comment